The crane morning is the only shoot in this trade with a date set weeks ahead
A pick over a rowhouse roofline runs inside a closure window somebody applied for, so it is the one day a camera can be planned around.
Most of what happens on a pool job happens whenever the ground and the crew allow. A pick on a District street is different. The window is applied for, the hour is agreed, cars come off the curb the night before, and everyone involved knows the date long before it arrives.
So treat it as a scheduled shoot rather than something to catch. Two positions on the sidewalk, one wide enough to hold the whole pick and one close on the load coming over the roofline, and somebody whose only job that morning is the phone.
If the pick moves for weather the shoot moves with it, which is easy to absorb if the plan already names a second date and a second person.
Nothing else on the job produces a sequence like it, and the whole thing is over before the crew breaks for coffee. One morning planned properly returns more usable material than a month of yard visits.